Showing posts with label DIY. Show all posts
Showing posts with label DIY. Show all posts

Wednesday, November 20, 2019

Guest Room Progress + A Light Paint Matched to a Skirt


We are rolling right along over in our Guest Bedroom Makeover. This past weekend we finished up the trim + paint, installed the bed AND switched out the ceiling fan for a chandelier. 


I found the chandelier on Facebook Market Place for $40. I drove to get it last week and was excited about the elegant factor it was sure to add to the space. We got it hung Saturday morning and the room instantly felt elevated.


Next, Brent put together the bed we purchased from Wayfair and guys - this bed was $146.75. Such a good price for a king bed and we were really pleased with the look and quality once it was set up. The only negative....the bronze color of the bed was fighting with the brassy/bronze color of the light. While we liked the color of the light we knew from the beginning we may end of painting it so we started tossing around paint color options - white, gray....plum? HA - one of these is not like the other but believe it or not Brent and I almost instantly agreed that a dramatic deep purple/plum color in a semi-gloss sheen could look really great in the space. The inspiration - a faux leather skirt of mine. Brent took the skirt to Home Depot and color matched it. Pretty spot on, right?


Next, Brent set up a make-shift paint booth out by the shed so he could spray the light. 


I have to admit it was a little scary watching the light turn from a pretty brassy color to plum, but we kept reminding ourselves it was just paint and if it was hideous we would just re-paint it. 


It took a few coats and we let it dry for several hours before bringing her back inside to install. 


Photographing this light was a beast. Daylight savings has not been my friend when it comes to capturing the true colors of the space, but the shot above is the best I got to really show off the color. Overall, we think we like it. I especially love how the glossy deep purple hue accentuates the details of the chandelier. We purchased these candelabra sleeves also from Amazon for each light so the electrical wires would be concealed. The color definitely feels good in the space, but I knew I needed to see the whole space come together with bedding, etc...to know for sure. I found these sheets on Amazon, another great deal - $29.70  for a King Sheet Set. There are 62 THOUSAND reviews raving about these sheets so I gave them a whirl. I got the white, and so far, they are super soft and nice. We got the bed all made up last night and things are feeling really good. Next up - nightstands, lamps, art....you know, more pretty. Excited to get this space wrapped up soon, just in time for the holidays! 

All photos are my own. 

Sunday, June 9, 2019

Shed Update


Graciouuuuusss! I am SO behind on blogging. Life has been crazy and we have been chugging along on projects so it has been hard to find free time, but I have a lot to share, so let's jump right into it.

The Shed. 

You know you are getting old when having a whole day or weekend (gasp!) to dedicate to shed building gets you excited, BUT, alas here we are. Between the weather and family activities, the shed kind of got put on the back-burner for a few weeks. Luckily we found ourselves with some good dedicated time to dig in so we did just that. Last we talked the posts had been set in concrete and the floor joists had been installed. Next up, Brent laid a piece of plywood over the floor joists and ran his electrical up through the floor in two spots. We had coordinated to have power pulled to this location of the yard when we were doing the pool, so Brent pulled the electrical first at the back of the shed for outlets that would be installed on the back wall and then again at the front of the shed so a switch could be run to operate the lights on the front wall. Speaking of walls....those were next!


The first wall the guys tackled was the back wall. The plan was to build it, install the siding and get it painted before it was installed.


The shed is only about a foot from the fence, which is why this sequence of events was our best bet; if we had waited until it was installed it would have been really hard to paint as the ladder wouldn't fit behind the fence...


Once that wall was up, the side walls followed. The front wall was the trickiest because it had the door. Brent ended up constructing it in the garage and then some of our neighbors were super gracious and helped him carry it over to the shed. It was HEAVY and not something Croix and I felt we could be super helpful with :)


Once all the walls were up, it was time to install the siding on the rest of the shed.


Next, Brent trimmed everything out with 1x4's which really started to give it a more finished look.


For the roof we originally planned on installing shingles similar to those on our house, but somewhere a long the way I started thinking it would be cool if the roof was metal. Just something different for this structure since it wasn't actually attached to the house. On one of Brent's many trips to Home Depot he came across this corrugated plastic roofing material and brought home a piece for us to consider. It has the look of metal, but will hold up a lot better and won't be too loud when it rains (even though I think that's about the best sound in the world).


The cute factor went up about a million points with the addition of the roof. The scalloped edge detail hanging off the front is just so good looking and we were and are super happy with our choice here.

Last, we worked on the doors.  Once the doors were cut, we played around with specifics on the ground before Brent got everything nailed into place.


The cross pieces had to be really considered here because those pieces would be what the hinges mounted on. After a lot of playing around with spacing, we got it all figured out and set the doors in place.

Now.....this would seem like the appropriate time to start painting, but it was about now that we decided to get chickens and add a coop to the side of the shed. Yep, you read that right, but you will have to wait until next week to see how that unfolded. For now, I will leave you with this shot of the finished shed, painted and all.


Paint color: Kendall Charcoal by Benjamin Moore.

All photos are my own. 

Tuesday, February 26, 2019

Laundry Room Remodel - Intro


I'm here today to introduce you to our first project of 2019 - THE LAUNDRY ROOM!!!

This is the first of two projects we have in the works over here on the home front and I'm SO EXCITED!!! If you remember, this laundry room was one of the rooms I was the most jazzed about when we moved in to this house. Our last house didn't have a real laundry room. Just a little pad in the basement for the washer and dryer. It was dark, damp, scary - not a happy place to spend a lot of time. But the laundry room in this house is conveniently located on the first floor, HAS A WINDOW, a laundry shoot and is a decent size, so I have been thankful for it everyday, despite it's blah appearance.


This room had a lot of potential but it also had some flaws from a layout perspective. There were 4 doors in this laundry room, 3 of which swung in at each other when opened. 


We removed the entry door and replaced it with an antique barn door we refurbished last year during our mudroom project. This definitely helped the situation, but the two doors covering the linen closet still made the space awkward. On top of the doors, this room (like the future home office space) had become a catchall.


In addition to the obvious, washer, dryer, hampers and sink this room housed a freezer a table saw, table saw stand, two vacuums, boxes of office supplies/documents that were never unpacked from our move (3 years ago...gasp!), cleaning supplies, beer making jars and buckets and other random odds and ends that I would just shove in there to get them out of my way in our main living area. It was a hot mess. Earlier this year we started talking through how and where to organize all of this stuff and decided everything currently in the laundry room would either be going to the linen towers in the guest bath (towels and sheets) a shed that we plan to build in the backyard (table saw, misc. tools, paint gun, etc.), the home office (giant box of files, paper and office supplies) or would be staying in the laundry room. Even with a lot of the items getting moved out of this space we still had a good deal we needed to store, so we decided the best plan of attack was to remove the french doors covering the linen closet and then build out the shelving inside. The closet came with two wire shelves, leaving a ton of wasted space.


Up until this point I had always housed my rolling laundry hamper in this closet, but in order to really optimize the storage this thing needed to go. That's when we decided we would stack our washer and dryer and then build out some shelving to the right of that to house laundry baskets. There will be a countertop on top of the shelving for me to use as a folding area and a hanging rod overhead attaching from the side of the washer and dryer surround and the wall.


The linen closet will get built-out with nothing but shelves all the way up. SO MUCH STORAGE!!! 

A few weeks ago the freezer died (with stuff inside - UGH!!) so he is gone now too. This side of the room is still somewhat of a question mark as we decide what type of sink to get and if we will go back in with another freezer, a second refrigerator or maybe nothing? Still some details to figure out, but TILE STARTED TODAY so we are rolling full steam ahead! Don't forget to follow along on instagram for all of the behind the scenes happenings between now and the next post!

All photos are my own. 

Monday, August 20, 2018

DIY Bunk Beds


What. a. whirlwind. weekend. 

In 3 1/2 days, 3 guys built-out and trimmed THIS:

For those of you that missed last weeks post, we have been planning out the transformation of our very large upstairs guest room into a cool and functional big boy room/playroom for Croix for months, and over the last 3 days a large part of that dream became a reality. 

Here is the official "before" shot of the future site of the bunks:

We taped out the location of the bunk beds, stairs and the fort. Croix was making sure the tape was in the right place on construction day!

Things got started on Thursday when Brent's Dad and Laura rolled into town. The guys reviewed, tweaked, analyzed and finalized the plan and then headed to Home Depot to load up on supplies. 

Once home, step one was covering the window. Initially we had hoped to keep the window, but it was just going to fall at a really awkward place, so we decided to cover it. From the outside the window looks just as it did, but from the inside, you would never know it existed. After that it was time to set the columns (2, 2x4s) against the left wall. These columns were especially important because they set the stage for the stability and overall layout of the bunks. The stud locations were really important here because the guys planned to anchor the columns to the studs for optimal stabilization.  So, the base was increased in depth 9" to catch the stud. This 9" space would allow us to create a lip along the front + a small ledge at the back for glasses, phone, cup of water, etc...

Next, they got started on the frames for the mattresses. The plan was to create Queen size bunks because A.) the room could handle this size, B.) we already had these mattresses and C.) we wanted bigger beds to give our home additional guest bed options when family or friends were in town. 
With the bottom mattress frame in place they installed the columns on the right side which were constructed of 2, 2x6s. These columns are bigger because more stability was needed since they would be free-floating in the space, not anchored to the wall. Remember, ability to anchor to the wall is dependent on stud location.

Electrical work was next. The guys tapped off an existing outlet to add an outlet, switch and sconce light for each bunk. 
With the framing of the skeleton up and the electrical in place it was time to start putting up the paneling. 
Croix and Gates were inspecting the paneling work on the bottom bunk, making sure everything was secure :)
Meanwhile, up top a small design change was made. At the end of the first day we had decided not to move forward with the fort. Not only was this portion of the bunk going to protrude into the space (left to right) more than we'd like but we realized the depth was going to be an issue because of the ceiling fan. In addition, Croix would definitely be able to stand atop it right now as a 2 year old, but it wouldn't be long before he would be too tall. We considered lowering the fort platform, but that would end up making the space underneath too short sooner rather than later, so we decided to just nix the whole thing. Because of this, the vertical boards going to the ceiling (look back, 2 photos before) could be cut down to make for a more open vibe.

Below is a shot that sums up Saturday....two guys working on top to cut down the verticals and two guys working down below on paneling. If we could have a house full of willing workers with every project we would be unstoppable! :)
Oh, I forgot the other guy that was around for all the action all weekend long - The Croix!
With the verticals cut down and the paneling up it was time to get the top rail installed. We added that vertical in the center so the rail would be stable, but I really like the craftsman look it brings to the whole piece. The tiny platform you see in the photo below is the landing for the stairs!
Next, came the most technical, pain-in-the-butt portion of the project....THE STAIRS. Oh the math, just typing about it makes my head hurt but here we go.... We couldn't use the standard pre-cut stairs that Home Depot offers because we had a fixed height (rise) and depth (run) that we had to achieve in order to hit the landing and ultimately the upper platform to enter the bed.  We knew we wanted a 2' platform at the top so we started from there.  We had to build the platform an extra 6"" deep to get past the column at the wall.  This left us with approximately 39" to get 5 steps up to the platform with one last step from the platform into the bed.  The steps wound up being approximately 8.5" high (rise) and approximately 8" deep (run).  The frames for the stairs were cut into a 2x10 board using precision cuts from expert craftsmen Bruce and Phillip Shearer.  
This was by far my favorite part of the project - does it get cuter than mini stairs?! 
Initially, the plan was to panel the side of the stairs, leaving only the small section against the wall for a little door. But the more we looked at it, we realized, covering up the small area right under the stairs was a missed opportunity for more storage and more charm, so....

We kept it! We will either leave it open or maybe add a little shelf inside for books/baskets.

The stairs were the last major construction element, so once those were in, the only thing left to do was to add the finishing boards over everything. This material is what gives the boards a nice smooth look - all ready to paint. The majority of this step went down on Sunday morning and by Sunday at lunch time, things were looking like this....
Talk about a labor of love! So many people took time out of their weekend to come and help us/cheer us on and we are SO happy with the results. Croix LOVES it and goes up and down the stairs over and over again. He's so excited!

Obviously we still have to sand, paint, add the little door, figure out a rail for the stairs, install lights, etc., etc. but for now we are relishing in the fact that THIS awesome beast is upstairs, only weeks away from being ready for Croix to move in! 

All photos are my own. 

Sunday, August 12, 2018

Bunk Room Intro


We are in the finishing stages of the bath remodel, you know, the stage where I agonize for days/weeks/months (please no) over the final details. While we work on bringing that all together, we have simultaneously moved on to the bunk room aka Croix's Big Boy Room!

Before we get into the plan and progress so far, let me give you a little back story on the space. 

You may remember the bedroom sits right outside the bathroom, and served as our work zone for all things tile cutting, wood chopping and staging for that project.


But before it became our work zone it served as a guest bedroom. 


A guest bedroom with two queen beds. Yes, the room is big. When the people did the remodel/addition to this house back in 2007 they split the entire second floor between the master suite and this bedroom. So, yeah it’s a big room for a little boy which is why we plan to turn this space into a bunk room/playroom for Croix + sibling(s).

So, here is our proper Before, empty and as it was the day we moved in.


The space was one of only 3 areas left with carpet. When we moved in the entire upstairs had carpet, but we had hardwoods installed in the upstairs hallway and our bedroom before moving in. So, this room + our closets were the only carpeted areas that remained. Until now that is....

Step one of this project was to remove the carpet and have hardwoods put down. We went with 5” white oak that we got from Floor & Decor. We bought hardwoods from them back in 2015 as well but went with 3 1/2” boards that time around, that size was unavailable this time, but we figured as long as all was stained the same color, it didn’t matter if the width changed in a bedroom. We had a small bundle of the 3 1/2” boards left from last time so we decided we wanted to add a “Herringbone Rug” in the little hallway within the bedroom.


It’s a small little detail, at only roughly 24” wide x 48” long, but we knew it would be a great little feature to greet you as you walk through the space. The installers weren’t thrilled to execute this idea, but they made it happen and we really love the way it turned out.


It’s amazing what a difference the hardwoods make. The room already has white-ish walls and gets GREAT natural light with 5 windows in the bedroom 1 in the closet, so the hardwoods were just the icing on the cake for an awesome backdrop to built-out Croix’s new room. 


Next up....the bunks!! We have been scheming for this part of the project for months and we're really excited for the concept. Brent drew out the whole thing on Sketch-Up (his skills know no bounds). 

Here is a sneak peek of our final plan...


We have enlisted help from our Dad’s and Brent’s brother Phillip, so hopefully by this time next weekend this portion will be done!

All photos are my own.

Tuesday, July 3, 2018

Cabinetry & Trim - Croix's Bath Part 4

Well folks, we have a LOT of catching up to do.

Let's start with the fact that we have cabinetry, trim and a mirror! 

You know, like REAL LIFE WORKING BATHROOM Essentials! woo!!

Shortly after my last post, we got the vanity set and boy did that make such a difference! Our cabinetry is, of course, from Bell Cabinetry & Design (the company I work for) and was designed by me for our Luxury Living Show Bath last year. It's 61" long with the sink base centered and 3-drawer bank cabinets, left and right. 


Wellllll, I guess I should say what looks like a 3-drawer cabinet on the right side. It's actually a pullout with adjustable shelves, just tricked out to look like drawers. Lucky Croix, I wonder what kinds of treasures he will store in there. :)


The cabinet color is Bruton White, CW-710 by Benjamin Moore in a satin finish, the interiors are stained walnut and the hardware is polished nickel from Top Knobs. 

Next up, we got busy getting the mirror installed. When I had originally designed the bath display for this cabinetry to sit in (the one that sat at Phipps Plaza), I had also designed a walnut mirror frame in the same finish as the inside of the cabinetry. Somewhere along the way the mirror was lost, but I still wanted that look, so we decided to try our hand at making our own. We headed to Home Depot and picked up some pine, a wood that is much cheaper than walnut, but we knew could be stained to look very similar. We also bought a plate glass mirror (also from Home Depot) in the size we were looking for - 36" x 48". 

Once home, Brent attached the mirror to the wall. He used clips that came with the mirror + Liquid Nails. Next, he used his miter saw to cut the wood to create a mirror frame. He used wood glue to hold the pieces together. After the glue dried, I sanded the frame down and it was ready for staining.



I applied one coat of stain - Varathane's Dark Walnut, but some of the areas where the wood glue had been didn't take the stain very well, so we sanded those areas again, added a little more stain and the frame was good to go!

Brent removed the little clips that were stabilizing the mirror and then used his nail gun to attach the mirror frame round the mirror.

And BOOM.....INSTANT HAPPY!


Once the mirror was set, we were ready to focus on the trim. I knew early on I wanted the trim to be something unique and cool, but was unsure of the exact direction at first. As the bath began to take shape a concept occurred to me... WOODEN BALLS! To be honest, I've been mildly obsessed with them for about a year now and have incorporated them into several of my designs, but I'd never seen wooden balls used in a trim application, and I thought it could be a fun way to add some depth, texture and fun to the space. 

We started by picking up 2" wide strips from Home Depot and I ordered 1" half round balls from here. Next, Brent cut the wooden strips and I used Liquid Nails to glue the balls to the strip. We planned for a staggered look, so before gluing, we pre-marked the boards so we could easily get the balls securely in place. While we waited for the glue to dry we got the baseboards installed. We went with a 6" high square baseboard. We pre-measured/marked the walls so the 2" strips would be mounted 9" apart on center.

Once the glue was dry Brent used his nail gun and a level to get the strips up on the wall.

My excitement grew with each strip that was installed. I could tell almost instantly I was going to love the outcome. 
We got as many installed as we could, but because we didn't have countertops in we couldn't finish the section behind the vanity, so as you can see from the photo above I started painting because I just couldn't wait and OH MY GOSH!!!!!!!

What do you think?! Pretty happy, right?

Annnnnd, this is where I'm going to leave you hanging. Countertops came next and they deserve a post all their own. Until next time....

All photos are my own. 

Wednesday, January 3, 2018

Croix's 2nd Birthday


On Saturday we celebrated Croix' 2nd birthday with a Croix Town Party!!


Croix is obsessed with all things car and truck. Specifically red cars and red trucks. So much so in fact, I actually wrote him a song last year. Wanna hear it?

*Set to the tune of Twinkle, Twinkle Little Star*

Red car, red car where are you?
We've been looking all through town. 

Up, up, up the road we go.
Down, down, down but no one knows. 

Red Car, red car where are you?
Red car, red car, We love you. 

It was an instant hit :) 

As we started thinking about what to do for his birthday, one thing was for sure...He was getting a red car!  And what does any car need? A town to ride around in of course! So, Brent and I went to work and built him a town full of places he frequents often.  Places like......

Target:


Complete with popcorn and apples - his favorite items to purchase !

And Home Depot:


He got this little workbench and tools for Christmas and he has been obsessed! Now he can officially pitch in on all of our projects around the house.

And lastly, there was a Starbucks, a bad habit he picked up from his Mom. 

One of the cool things about this car is it can be operated with a remote control. So, everyone took turns maneuvering Croix + friends (Hi Aria!) around the town. 


Even his cousin Gates enjoyed some time on the road with a red car of his own!


The town turned out to be our last DIY of 2017 and was relatively easy to put together. Weeks ago we made a run to Michaels and picked up wooden letters to spell out our 3 stops (Target, Home Depot & Starbucks). We also picked up some foam pieces to form the Target symbol + the red balls that sit outside of Target.


A few days before the party we started getting everything painted.


For the roads we cut out strips of brown paper and painted them black. Once dry, we used white spray paint to make the lines. The day of the party we cleared everything out of the garage and put the town together. It was relatively simple and super cute and most importantly Croix was all about it, especially THE CAR. When we brought the car down he said"wow!" Genuine excitement, it was so cute!

It's hard to believe how much he's grown in a year. The night of his first birthday he was able to stand by himself for the first time and now only 1 year later he can say whole sentences and run, skip and dance anywhere and everywhere. He's growing up and it's equal parts thrilling and heartbreaking to watch. But from what I hear that's what this whole parenting thing is all about. Happy Birthday Croix or as he says it "HAPPY DOO-DAY!!"

All photos are my own.